
This means that Omnia design engineers around the UK can now handle complex cable installations with increased ease, efficiency, and accuracy.
This IT and software upgrade and allows us to work simultaneously on two projects at once, and along with our new 3D thermal modelling module, allows our engineers to better reflect how cables are actually installed on site.
This is crucial in congested areas like substations and urban environments, where multiple circuits can cross, bend, or change depth along the cable route.
By modelling the full cable route in 3D, we can:
This upgrade marks an exciting development in our design process, keeping our teams at the cutting edge of digital engineering technology. With a clearer picture of real operating conditions, we can optimise cable layouts, avoid unecessary conservatism and provide clients increased assurance that cable systems will remain safe and reliable throughout their lifetime, even if installation has been difficult.

